Once completed, the suspension bridge was a total of 25 feet long, 8 feet high and could support a 100-pound concrete panel. The bridge was assembled early Monday morning on Dexter Lawn.
Once completed, the suspension bridge was a total of 25 feet long, 8 feet high and could support a 100-pound concrete panel. The bridge was assembled early Monday morning on Dexter Lawn.